IMPACTUL CUTREMURELOR BANATENE ASUPRA CONSTRUCTIILOR DIN TIMISOARA

Autor/autori: Lect. dr. ing. Mircea ALEXE

Rezumat: Cu toate incercarile autoritatilor de a reglementa prin legislatie tehnica activitatea de realizare a constructiilor, lipsa personalului calificat creeaza probleme deosebite. Acestea pot duce la obtinerea unui produs finit sub nivelul de calitate proiectat si, mai mult, pot afecta siguranta structurala. Printre cele mai intalnite motive ale aparitiei erorilor de executie sunt: constructii realizate in regie proprie, cu o echipa de asazisi meseriasi sau (mai rau) cu rude si prieteni; Interpretarea eronata a recomandarilor cuprinse in proiecte si caiete de sarcini; folosirea in constructii a unui numar mare de muncitori necalificati, la operatii ce necesita specializare (cu sau fara contract de munca); folosirea unor muncitori cu alta calificare (zidari folositi la dulgherie etc); lipsa completa a uneia dintre calificarile absolut necesare (dulgher, fierar –betonist etc); lipsa de coordonare intre termenele de executie si necesarul de forta de munca (graficul de lucrari); lipsa de coordonare intre echipele de muncitori de diverse specializari; lipsa unui inginer constructor, sef de punct de lucru (altul decat responsabilul tehnic cu executia); investitorul, persoana fizica sau juridica, care activeaza intr-un capitalism salbatic in perioada de acumulare primitiva de capital. Acesta dorinta de acumulare determina ca principalul criteriu ce sta la baza intregului proces de realizare a investitiei sa fie costul.

Cuvinte cheie: erori de executie, cauzele erorilor, lipsa specialistilor


Abstract: Despite the attempts made by authorities to legally regulate technical construction activity, the lack of qualified staff creates special problems. This may result in a below standard finished product and, moreover, can affect the structural safety. The most common causes for execution errors are: self made Buildings, involving a team of so-called artisans or (worse) with family and friends, the misinterpretation of the recommendations of the project and specifications; the use of a large number of unskilled workers in operations construction that require training (with or without employment contract); using other qualified workers (masons used in carpentry, etc.); complete lack one indispensable qualifications (carpenter, blacksmith, concrete etc); lack of coordination between lead times and labor requirements (work schedule); lack of coordination between various specializations crews; lack of a civil engineer, chief operating point (other than the responsible technical execution); investor, natural or legal person, acting in a savage capitalism during the primitive accumulation of capital. This desire for accumulation causes the main criterion underlying the whole process of making the investment to be cost.

Keywords: runtime errors, causes of errors, lack of specialists

 

DOWNLOAD PDF